At the same time, we are finally seeing some progress in the HuDong shipyard too. Looks like they've finally fixed the crane problem. The foremast of the ship has now been installed on the 3rd 054A from this shipyard. It looks probably 3 or 4 months away from launching.
We've also seen some pictures of F-22P's first unit undergoing sea trials.
This comment has been removed by the author.
ReplyDeleteshould be the 5th 054A
ReplyDelete529, 530, 568, 570
Yep, and the 054A at HD should be the 6th. Looks like it's going to be 569 and 571, both going to SSF.
ReplyDeleteSSF seems to be getting most of the goodies, and with their new base in Hainan, theyre definitely the power projection fleet.
ReplyDeleteWhat roles do you see NSF and ESF having?
ESF, concentrated on Taiwan scenario, NSF, should be to defend against Japan threat, but it really is not capable of that.
ReplyDelete